谈判英语一日通02-11
教程:谈判英语一日通  浏览:745  
  • 00:00/00:00
  • 提示:点击文章中的单词,就可以看到词义解释

    Modify the Delivery Date 修改交货日期

    Dialog

    A third bargaining chip is modifying the delivery date to allow more time for the manufacturer to produce the required units.

    第三个可以用来议价的筹码是修改交货日期,这给制造商更充裕的时间来制造你所订的数量.

    Mel:And that's the bottom line.Not too bad ,even if I do say so myself.

    这是最低价格了,我自己看都觉得很不错了.

    Bill:Well,to be honest,I was figuring on something about 10% lower.

    老实说,我还希望能再打9折.

    Mel:That's about what I'd normally charge,but you added these time restrictions and I'm going to have to pay some overtime to get it in under the wire.

    其实我平常就是那个价码,但因为你有时间限制,我得请工人加班,才能准时交货.

    Bill:So how much time do you need to lower the price?

    时间要往后延多久,我才能有折扣?

    Mel:Usually there isn't any time requirement.

    我通常都不压时间限制的.

    Bill:I know that,but I'm not going to do that.I want this finished quickly with no breaks in between,so the time limit stays.

    我知道,但我不想这样.我希望这批货尽快完成,完全没有延误,所以时间限制不能变.

    Mel:I won't do that to you.

    我不会害你开天窗的.

    Bill:Right,not with this penalty in the contract.

    没错,因为这次迟交会有罚款.

    Mel:Okay.Give me fifteen working days from start to finish and I'll lower the price 10%.

    好吧.开工后,给我15个工作日,我就再降个百分之十.

    Bill:How about ten days?

    10天如何?

    Mel:I need 12 or no deal.

    我要12天,否则免谈.

    Bill:Done!

    成交.

    Vocabulary 重要词汇

    bottom line总价底线

    restriction 限制

    under the wire顺利运作

    penalty罚款

    0/0
      上一篇:谈判英语一日通02-10 下一篇:谈判英语一日通02-12

      本周热门

      受欢迎的教程

      下载听力课堂手机客户端
      随时随地练听力!(可离线学英语)